How Long Does It Take To Install Your Pool?

0

On the average, swimming pools take between 8 and 12 weeks from start to finish. However, it could take a little longer depending on factors like your location, the time of year and your contractor. Below are different steps you have to take when building a pool and the time each of these steps should take.

Design and Permits

Building your pool starts with getting in touch with a contractor to design your pool. This could two to three weeks if your contractor is not too busy. After you get your design, you can apply for permits from the relevant agencies. This is important because you cannot start working on the pool without approval. You can get all the permits you need within a week or two. However, it might take a longer time if you factor in outdoor structures and custom accessory buildings.

Excavation

For inground pools, there is no escaping the excavation process. The time required for excavation varies depending on a number of factors. In most cases excavation will take just one or two weeks. Once you are done with the digging, it is time to take care of things like plumbing lines, electrical fixtures, hydro lines and lighting. All these things will take about two to four weeks.

Building the Pool Shell

This is a complicated process and it might take up to four weeks to get it right. The material you choose will determine how long the process will take. Typically, most pool owners go for vinyl, fiberglass or concrete. Concrete takes the longest time and this means you may need as much as right weeks to complete this stage of the project.

Pool Landscaping and Patio Construction

This is an important stage of the project because it adds beauty and style to the pool and the surrounding areas. For this stage of the project, you need a professional with an eye for beauty. Depending on your inclination, you could go green and use natural landscaping to beautify the pool area. A great-looking design will add beauty to the pool and increase the value of your property. Pool landscaping and patio construction will take two to four weeks. To ensure you don’t lose any time, pool builders will work on your waterfall, lighting and other features along with the pool landscaping.

Factors that Could Delay the Project

Even at the best of times, unforeseen circumstances might delay your swimming pool project. To ensure you do not run into any hitches, you should avoid the following things.

Bad weather/Overworked Contractors

Building your pool at the wrong time of the year will definitely lead to unwanted delays. It is best to start the project when the weather will cooperate with you. In addition, you should contract your pool to a firm of experts who are relatively free to handle your project and give it the attention it deserves. Finally, you should always err on the side of caution. It will take eight to twelve weeks to complete your pool. However, it is better for your peace of mind to allot 13 weeks to the project. This way, you will not be disappointed.

Need help? Visit https://whitespools.com/pool-builders-covington/ today.

Essie Lemke

Things to Know About Central Air Conditioners

Previous article

How Often Should Pest Control Be Done In An Apartment?

Next article

You may also like

Comments

Comments are closed.

More in Home